PQS
GMP VIRTUAL FACILITY INSPECTIONManufacturing Walkthrough • Training Inspection GMP-07
Controlled manufacturing areaPersonnel Gowning Airlock
PERSONNEL ENTRY
STEP-OVER BENCH

Personnel Entry

Observe gowning behavior, personal-item control and whether entry is consistent with the site's approved gowning procedure.

DISPENSING BOOTH
DP -12 Pa
AIRFLOW OK
BALANCE BAL-09
12.530 kg
MATERIAL STATUS
QUARANTINE

Dispensing & Material Control

Confirm material identity/status, balance readiness, line clearance and whether only released materials enter dispensing.

HIGH-SHEAR GRANULATOR GRN-02
BATCH TX240906A
RPM 180
STATUS RUN
ROOM STATUS
IN PROCESS

Granulation Suite

Check equipment status labels, batch-record control, open-document handling and whether line clearance remains evident during processing.

TABLET PRESS CMP-04
SPEED 72,000 tab/h
REJECTS 0.4%
DEDUSTER
CLEAN / IN USE

Compression Room

Observe product containment, in-process control, reject handling and housekeeping while the batch is actively compressed.

BLISTER
LINE 03
RUN
VISION SYSTEM
CAMERA OK
LINE CLEARANCE
VERIFIED

Primary Packaging

Review component control, reconciliation, line clearance, print/vision verification and segregation of printed packaging material.

STATUS ZONE
HOLD

Warehouse Hold Area

Verify physical/administrative segregation, status identification, traceability and whether released and held materials can be confused.